86exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


Henan Province Highway Affiliated Facilities Co.,Ltd

Products >> Hydraulic Double-Cylinder Pre-Heater (TT-RFS700)

Hydraulic Double-Cylinder Pre-Heater (TT-RFS700)

Build Your Online Product Catalogs?



Description
Product Name: Hydraulic Double-Cylinder Pre-Heater (TT-RFS700)
Supply Ability: 50-100
Related proudcts
Specifications Cold plastic road marking machine
Price Term: FOB
Port of loading: Tianjin
Minimum Order One machine
Unit Price:

TT-RFS700
Hydraulic Double-Cylinder Pre-Heater
(Patent NO. ) ZL2004300103715

1. Engine: The 20 horsepower water-cooled electric startup diesel engine with three-cylinder inline, low noise and environment protection has the indication of water temperature. Voltage and engine oil, whose max rotating speed is 2200r/min.

2. Drive: The diesel drives stirrer to run through gear pump, dual control valve, overflow valve and hydraulic motor.

3. Hydraulic tank: The tank is designed with windows, hot-spreading slile and indication of oil temperature.

4. Heating system: A 15kg petroleum liquefied gas storage tank is used to respectively supply gas to furnace chamber and outside ***rker lighter. The furnace is the imported four-circuit furnace, which equip with low temperature combustion system which makes the liquefied gas burned more fully and economical. The connection pipes are weldless steel pipes and rubber pipes with heat and pressure resistance, and the heater adopts electric ***rk to start. The heating temperature can be freely adjusted in the scope of 0-300'Caccording to the different kinds of coating.

5. Melting pot: The arc punching bottom pot which is made of special steel with anti-scorching, high temperature and oxidation resistance, and the vertical vane type multi-hydraulic agitator make more coating to melt with better quality.

6. Thermometer: The imported heating oil conduction sensing thermometer with high temperature and shock resistance makes the temperature sensing more accurate.

7. Operation control: The manual dual control valves respectively control the agitators in the two cylinders to do positive and negative agitation.

8. Warmer system: The scientifically filled warm materials, and the multi warmer system make the time of warm longer and the efficiency higher.

9. Ventilating system: Four dumping chimneys at the top of pre-heater fully discharge the smoke in the chamber.

10. Feeding port: The intermeshing and close feeder makes the onoff more safety, acc

Contact Us
Company: Henan Province Highway Affiliated Facilities Co.,Ltd
Contact: Ms. Lucy Jone
Address: Huayuan road
Postcode: 450011
Tel: 86-0371-65785701
Fax: 86-0371-65785709
E-mail:         


Copyright© Henan Province Highway Affiliated Facilities Co.,Ltd All Rights Reserved.
Tel : 86-0371-65785701 Fax : 86-0371-65785709
Powered by 86exporter.com